Event ID
28
Description
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Manual Means, Depth Above 6 m
Unit