Work: Earthwork Excavation in Foundation
Event Unit Detail ID
Hard Rock, Manual Means, Blasting Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Hard Rock , Manual Means, Blasting
31
Hard Rock, Mechanical Means, Blasting Prohibited Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Hard Rock, Mechanical Means, Blasting Prohibited
32
Marshy Soil, Manual Means, Depth Up to 3m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Marshy Soil, Manual Means, Depth Up to 3m
33
Marshy Soil, Mechanical Means Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Marshy Soil, Mechanical Means
34
Ordinary Rock, Manual Means, Depth Up to 3 m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Rock , Manual Means, Depth Up to 3 m
29
Ordinary Rock, Mechanical Means Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Rock, Mechanical Means.
30
Ordinary Soil , Manual Means, Depth 3 m to 6 m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Manual Means, Depth 3 m to 6 m
24
Ordinary Soil , Manual Means, Depth Above 6m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Manual Means, Depth Above 6m
25
Ordinary Soil , Manual Means, Depth Up to 3m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Manual Means, Depth Up to 3m
23
Ordinary Soil, Mechanical Means, Depth 3m to 6m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Mechanical Means, Depth 3 m to 6 m
27
Ordinary Soil, Mechanical Means, Depth Above 6 m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Manual Means, Depth Above 6 m
28
Ordinary Soil, Mechanical Means, Depth Up to 3m Cubic Meter
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications. Ordinary Soil , Mechanical Means, Depth Up to 3m
26