Event | Unit | Detail | ID |
---|---|---|---|
All Type Soil, Manual Means | Cubic Meter | π©
A Roadway Excavation in all types of Soil by Manual Means as per drawing and technical specification, including removal of stumps and other deleterious matter, with all lifts and lead as per Drawing and instruction of the Engineer.
|
10 |
All Type Soil, Mechanical Means | Cubic Meter | π©
Road way Excavation in all types of soilusing Mechanical Means as per Drawing and technical specifications including removal of stumps and other deleterious matter, all lifts and lead as per Drawing and instruction of the Engineer.
|
11 |
Hard Rock, Chemical | Cubic Meter | π©
Roadway Excavation in hard rock manually with use of chemical, including breaking rock, disposal within all lifts and lead as per Drawing and Technical Specifications
|
18 |
Hard Rock, Manual Chiseling | Cubic Meter | π©
Roadway Excavation in hard rock manually chiseling including breaking rock, lifts and lead for disposal as per Drawing and Technical
Specifications |
17 |
Hard Rock, Manual drilling and blasting | Cubic Meter | π©
Roadway excavation in hard rock with manual drilling, blasting, breaking, lifts and leads all complete as per Drawing and instruction of the Engineer.
|
15 |
Hard Rock, Mechanical drilling and blasting | Cubic Meter | π©
Roadway Excavation in hard rock with mechanical drilling, including blasting and breaking, and disposal of cut road within all lifts and leads as per Drawing and instruction of the Engineer.
|
14 |
Hard Rock, Rock Breaker | Cubic Meter | π©
Roadway Excavation in hard rock with rockbreakers, including breaking rock, lifts and lead for disposal as per Drawing and Technical
Specifications |
16 |
Hard Rock, Trimming After Blasting | Cubic Meter | π©
Carrying out excavation in hard rock to achieve a specified slope of the rock face by controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated rock by machine, with all lifts and lead as per Drawing and instruction of the Engineer.
|
21 |
Marshy Soil, Mechanical Means | Cubic Meter | π©
Roadway Excavation in marshy soil as per Drawing and Technical Specifications
|
19 |
Ordinary Rock, Manual Means | Cubic Meter | π©
Roadway Excavation in ordinary rock by manual means as per Drawing and Technical specification, including all lift and lead as per Drawing and instruction of the Engineer.
|
12 |
Ordinary Rock, Mechanical Means | Cubic Meter | π©
Roadway Excavation in ordinary rock as per Drawing and Technical specification, including all lift and lead as per Drawing and instruction of the Engineer.
|
13 |
Stripping, Agricultural Field Material | Cubic Meter | π©
Stripping of top soil from borrow areas located in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to maintain fertility of the agricultural field, finishing it to the required levels to the satisfaction of the farmer as per Drawing and Technical Specifications.
|
47 |
Stripping, Roadside Material | Cubic Meter | π©
Stripping, storing of top soil by road side at 15 m internal and re-application on embankment slopes, cut slopes and other areas in localities where the available embankment Material is not conducive to plant growth as per Drawing and Technical Specifications
|
46 |
Surface Treatment | Square Meter | π©
Preparation and surface treatment of Formation by removing mud and slurry, watering to the extent needed to maintain desired moisture content , compacting all complete as per Drawing and Technical Specifications.
|
48 |
Unserviceable Soil, Mechanical Means | Cubic Meter | π©
Removal of unserviceable soil including excavation, loading and disposal up to 1000 meters lead
|
20 |