Event | Unit | Detail | ID |
---|---|---|---|
Camp | π©
Providing and establishing camp with mobilization and demobilization for contractor's Labour and staff and demolishing after completion of works as per the specifications and instruction of the Engineer.
|
170 | |
Maintenance, Existing Road | π©
Carry out maintenance of the existing road to keep the road serviceable through out the contract period as per specification and instruction of the Engineer.
|
168 | |
Operation and Maintenance, Temporary Diversion | π©
Operation and maintenance of Temporary diversion of road/
bridge to keep the road serviceable through out the contract period as per specification and instruction of engineer. |
167 | |
Project Record | π©
Supply of Project Record as per specifications and instruction of the Engineer.
|
172 | |
Project Signboard | π©
Providing and installation of project signboards with size of 1.8 x 1.2 m as per specification and instruction of engineer.
|
169 | |
Reinstatement, Quarry Sites | π©
Reinstatement of quarry sites at the completion of works as instructed by the engineers.
|
173 | |
Relocation | π©
Relocation of services / minor infrastructures, as per specifications and instruction of the Engineer.
|
171 |