Command Your Project
Work: Site Clearance
Event Unit Detail ID
Clearing and Grubbing Lead Up to 1000 m ,Manual Means, Light Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Manual Means, Light Jungle
180
Clearing and Grubbing Lead Up to 1000 m ,Mechanical Means, Light Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Mechanical Means, Light Jungle
183
Clearing and Grubbing Lead Up to 1000 m ,Mechanical Means, Throny Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Mechanical Means, Throny Jungle.
184
Clearing and Grubbing Lead Up to 1000 m, Manual Means, Thorny Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Manual Means, Thorny Jungle
181
Clearing and Grubbing Lead Up to 1000 m, Manual Means, Uprooting of Bamboo Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Manual Means, Uprooting of Bamboo
182
Clearing and Grubbing Lead Up to 1000 m, Mechanical Means, Uprooting of Bamboo Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Mechanical Means, Uprooting of Bamboo
185
Clearing and Grubbing Lead Up to 30 m, Manual Means, Light Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Manual Means, Light Jungle.
174
Clearing and Grubbing Lead Up to 30 m, Manual Means, Thorny Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Manual Means, Thorny Jungle.
175
Clearing and Grubbing Lead Up to 30 m, Manual Means, Uprooting of Bamboo Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Manual Means, uprooting of bamboo.
176
Clearing and Grubbing Lead Up to 30 m, Mechanical Means, Light Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Mechanical Means, Light Jungle.
177
Clearing and Grubbing Lead Up to 30 m, Mechanical Means, Thorny Jungle Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Mechanical Means, Thorny Jungle.
178
Clearing and Grubbing Lead Up to 30 m, Mechanical Means, Uprooting of Bamboo Square Meter
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. Mechanical Means, uprooting of bamboo.
179
Clearing Grass Square Meter
Clearing grass/ top soil and removal up to a distance of 50 meters outside the periphery of the area , including cutting and filling of small undulation.
191
Cutting Tree, Girth 1800mm-2500mm Nos
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling in the depression/pit. Girth from 1800mm to 2500mm
189
Cutting Tree, Girth 300mm-600mm Nos
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling in the depression/pit. Girth from 300mm to 600mm
186
Cutting Tree, Girth 600mm-900mm Nos
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling in the depression/pit. Girth from 600mm to 900mm
187
Cutting Tree, Girth 900mm-1800mm Nos
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling in the depression/pit. Girth from 900mm to 1800mm
188
Cutting Tree, Girth Above 2500 Nos
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable Material with all lifts and up to a lead of 1000 meters and earth filling in the depression/pit. Girth Above 2500.
190
Dismantling, Cement Concrete M15/ M20, Manual Means Cubic Meter
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters. Cement Concrete M15/M20, Manual Means
193
Dismantling, Cement Concrete M15/ M20, Mechanical Means Cubic Meter
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters. Cement Concrete M15/M20, Mechanical Means
195
Dismantling, Lime/Cement Concrete M10, Manual Means Cubic Meter
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters. Lime/Cement Concrete M10, Manual Means
192
Dismantling, Pre- Stressed/ RCC M20 and Above, Manual Means Cubic Meter
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters. Pre- Stressed/ Reinforced Cement Concrete M20 and Above, Manual Means
194
Dismantling, Pre- Stressed/ RCC M20 and Above, Mechanical Means Cubic Meter
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters. Pre- Stressed/ Reinforced Cement Concrete M20 and Above, Mechanical Means
196