Event | Unit | Detail | ID |
---|---|---|---|
Burrow Materials | π©
Providing and laying Median and Island above road level with approved Material deposited including compacted as per Drawing and
Specifications. ( using material from borrow area) |
73 | |
Cement Treated Subbase | π©
Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place , grading and compacting at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base as per Drawing and Technical Specifications.
|
66 | |
Cement Treated Subbase, Pulverizing | π©
Providing, laying and spreading soil on a prepared sub grade, pulverizing, adding the designed quantity of cement to the spread soil, mixing in place , grading and compacting at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base as per Drawing and Technical Specifications.
|
65 | |
Crusher Run Macadam | π©
Crusher Run Macadam Base and sub-baseProviding and laying Crusher Run Macadam on a prepared surface, spreading and mixing , watering and compacting to form a layer of sub-base/Base course as per Drawing and Technical Specifications.
|
70 | |
Dry Bound Macadam, Grading-I | π©
Providing, laying, spreading and compacting stone aggregates of specific sizes to dry bound macadam including spreading in uniform thickness, hand packing, rolling and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, and compacting to the required density as per Drawing and Technical Specifications. Grading-I
|
76 | |
Dry Bound Macadam, Grading-II | π©
Providing, laying, spreading and compacting stone aggregates of specific sizes to dry bound macadam including spreading in uniform thickness, hand packing, rolling and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, and compacting to the required density as per Drawing and Technical Specifications. Grading-II
|
77 | |
Footpath Seperator | π©
Providing and making footpath/separator of 150 mm compacted granular sub base and 25 mm thick cement concrete grade M 15, over laid with pre cast concrete tiles in cement mortar 1:3 including provision of all drainage arrangements but excluding Kerb channel as per Drawing and Technical Specifications.
|
74 | |
Furrows | π©
Making 50 mm x 50 mm furrows, 50 mm deep, 450 to the center line of the road and at one meter interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated Material .
|
67 | |
Granular Sub Base, Manual Means | π©
Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density, complete as per Drawing and Technical Specifications. Manual Means
|
64 | |
Granular Sub Base, Mechanical Means | π©
Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the desired density, complete as per Drawing and Technical Specifications. Mechanical Means
|
63 | |
Inverted Choke | π©
Providing, laying, spreading and compacting screening / coarse sand of specified grade in uniform layer on a prepared surface and compacting to form a inverted Choke as per Drawing and Technical Specifications.
|
68 | |
Roadway Cutting Material | π©
Providing and laying Median and Island above road level with approved Material deposited including compacted as per Drawing and Specifications. ( using material from Roadway excavation).
|
72 | |
Telford Base Block Pitching | π©
Providing laying, spreading watering, levelling and compaction of Telford base ( Block pitching) as per Drawing and Technical Specifications.
|
75 | |
Water Bound Macadam, Manual Means | π©
Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and Technical Specifications. Manual Means
|
69 | |
Water Bound Macadam, Mechanical Means | π©
Providing, laying, spreading and compacting Water bound macadam including brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Drawing and Technical Specifications.
|
71 | |
Wet Mix Macadam, Base Course, B1 Material | π©
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub base / base course on well prepared surface and compacting to achieve required density as per Drawing and Technical Specifications. A Base course with B1 material
|
78 | |
Wet Mix Macadam, Base Course, B2 Material | π©
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub base / base course on well prepared surface and compacting to achieve required density as per Drawing and Technical Specifications. A Base course with B2 material
|
79 | |
Wet Mix Macadam, Sub Base Course, S1 Material | π©
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub base / base course on well prepared surface and compacting to achieve required density as per Drawing and Technical Specifications. A Sub Base course with S1 material
|
80 | |
Wet Mix Macadam, Sub Base Course, S2 Material | π©
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC laying in uniform layers in sub base / base course on well prepared surface and compacting to achieve required density as per Drawing and Technical Specifications. A Sub Base course with S2 material
|
81 |